Final | 3/14/2019 | 3/15/2019 | 3/15/2019 | A | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by jamie berg A/Cs not set at time of final. Disc were in place. final ok
|
Electrical Rough-In | 12/21/2018 | 12/21/2018 | 12/21/2018 | P | PASS |
James Ady
|
|
|
Floor heat bathroom Phone #: ###-#### Inspection requested via web by jamie berg master floor heat ok to cover
|
Electrical Rough-In | 9/6/2018 | 9/7/2018 | 9/7/2018 | A | PASS |
James Ady
|
|
|
Dwelling Phone #: ###-#### Inspection requested via web by jamie berg rough in ok
|
Permanent Service | 9/7/2018 | 9/7/2018 | 9/7/2018 | P | PASS |
James Ady
|
|
|
Dwelling Phone #: ###-#### Inspection requested via web by jamie berg p/s u/g n ok
|
Rough-In Permanent Service | 8/6/2018 | 8/7/2018 | 8/7/2018 | A | PART |
Rock A. Hudson
|
|
|
Partial rough-in / deck incomplete / scaffolding needed Phone #: ###-#### Inspection requested via web by jamie berg OK to Foam seal only. Areas of concern- Patio doors may have fixed panels for wall space main and master bed, kitchen under cab stubs, Nail plates up bed corner, basement corner, Mechanical rm switch legs missing, Hang can over stairs, Living room, mechanical rm, patios not ready. Service not ready. Need breaker blanks or breakers for temp power in panels
|