Final | 10/4/2018 | 10/5/2018 | 10/5/2018 | P | PASS |
James Ady
|
|
|
Mike Jagger is Electrician Phone #: ###-#### Inspection requested via web by Matthew White Final ok
|
Electrical Rough-In | 9/27/2018 | 9/28/2018 | 9/28/2018 | A | PASS |
James Ady
|
|
|
Kelly Phone #: ###-#### Corrections made final ok
|
Final | 9/27/2018 | 9/27/2018 | 9/28/2018 | P | CANC |
James Ady
|
|
|
Kelly Phone #: ###-####
|
Final | 9/27/2018 | 9/27/2018 | 9/27/2018 | P | FAIL |
James Ady
|
|
|
Kelly Phone #: ###-#### 210.11C2 and C3. Laundry room and Bath shall have 20Amp Dedicated circuits. ( Washer was moved from kitchen closet to back room. Needs updated circuitry and removed from bath circuit.) 314.20 Boxes set back more than 1/4in shall have extension rings. (All Devices in tile) 406.12 All dwelling unit receps shall be Tamper proof. (Dining and Front room)
|
Electrical Rough-In | 8/7/2018 | 8/8/2018 | 8/8/2018 | A | PASS |
Tom Saunders
|
|
|
Kelly Phone #: ###-####-inspection rough in only for master bath-see job description...ok to cover master bath and new circuit for micro and ceiling fan...contractor is agreeing to take over work of other contractor permit ELE18-00335...refer to rough in on this permit...not all walls were opened and required outlets were added for code
|