Final | 12/12/2018 | 12/12/2018 | 12/12/2018 | P | PASS |
James Ady
|
|
|
Plans left on site in the meter box Phone #: ###-#### Inspection requested via web by Ashley White Final ok
|
Electrical Rough-In | 11/29/2018 | 12/6/2018 | 12/6/2018 | A | PASS |
James Ady
|
|
|
Plans have been left on site in the meter box Phone #: ###-#### Inspection requested via web by Ashley White Inspected panel and disc. Ready for final after array has been installed
|
Electrical Rough-In | 11/29/2018 | 12/4/2018 | 12/4/2018 | A | PASS |
James Ady
|
|
|
Please call Kelly, the foreman on site, and let him know when you are on your way. He can be reached at ###-#### Phone #: ###-#### Inspection requested via web by Ashley White Listing only ok
|
Final | 9/13/2018 | 9/20/2018 | 9/20/2018 | P | NR |
James Ady
|
|
|
Please call Brian when you are on your way, he is the foreman on site ###-#### Phone #: ###-#### Inspection requested via web by Ashley White Not ready
|
Electrical Rough-In | 9/13/2018 | 9/20/2018 | 9/20/2018 | A | PASS |
James Ady
|
|
|
Please call Brian when you are on your way, he is the foreman on site ###-#### Phone #: ###-#### Inspection requested via web by Ashley White Listing only ok Line side tap.
|