Final | 9/28/2018 | 9/28/2018 | 9/28/2018 | P | PASS |
Mark Moncarr
|
|
|
a re-scheduled final for solar install
The gate will be open and held ajar; and no dogs!!
The customer will be in and out all day, but knows you might be there today.
Approved plans on site, and give me a call at ###-#### if ya need anything at all.
Thanks guys Phone #: ###-#### Inspection requested via web by Ryan King Ok final. All labels present, brkrs and wire size accordingly.
|
Final | 9/25/2018 | 9/26/2018 | 9/26/2018 | P | NH |
Mark Moncarr
|
|
|
Approved plans on site, at the meter.
All work is exterior, from array to disconnect, so you''ll be able to see the whole thing! No inside access required, but a small unlocked chain link fence into back yard. There are no pets and customer knows your coming.
All conduit, enclosures, the combiner and disconnect are labeled and all equipment is as plan review submissions.
Thanks guys, Ryan King Phone #: ###-#### Inspection requested via web by Ryan King Talked to Ryan about coordinating time with homeowner to be there, as there was a couple of dogs on the property.
|
Electrical Rough-In | 9/19/2018 | 9/20/2018 | 9/20/2018 | A | PASS |
Mark Moncarr
|
|
|
panel listing inspection for solar install
Phone #: ###-#### Inspection requested via web by Ryan King Ok cover. All items UL listed.
|