Final | 11/2/2018 | 11/2/2018 | 11/2/2018 | P | PASS |
Rock A. Hudson
|
|
|
This was the lighting control cabinet that we had to replace with a 2 meter pedestal. Ready for inspection. Phone #: ###-#### Inspection requested via web by Kelly Tarter Final ok
|
Permanent Service | 11/2/2018 | 11/2/2018 | 11/2/2018 | P | PASS |
Rock A. Hudson
|
|
|
This was the lighting control cabinet that we had to replace with a 2 meter pedestal. Ready for inspection. Phone #: ###-#### Inspection requested via web by Kelly Tarter Originally installed a single meter base pedistal, changed to 2 meter base pedistal. p/s u/g n ok
|
Permanent Service | 8/10/2018 | 8/10/2018 | 8/10/2018 | P | CANC |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Kelly Tarter Already inspected by DD
|
Rough-In Permanent Service | 8/8/2018 | 8/9/2018 | 8/9/2018 | A | PASS |
Daryl DeGrange
|
|
|
Phone #: ###-#### Inspection requested via web by Kelly Tarter UL Listed Lighting pedestal p/s u/g n ok
|