Final | 9/24/2018 | 9/24/2018 | 9/24/2018 | P | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Stan Woodward card on site and signed..... Final ok
|
Electrical Rough-In | 9/20/2018 | 9/20/2018 | 9/20/2018 | P | PASS |
Eric Story
|
|
|
Ceiling cover Phone #: ###-#### Inspection requested via web by Stan Woodward Temp lights installed at this point and will inspect again once correct ones arrive
|
Permanent Service | 8/22/2018 | 8/23/2018 | 8/23/2018 | A | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Stan Woodward Fault current is 9,288 and breakers frame are at 25kv
p/s o/h n ok
|
Permanent Service | 8/22/2018 | 8/22/2018 | 8/22/2018 | P | FAIL |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Stan Woodward 110.24 Aavailiable fault current calc required proir to service being energized
|
Electrical Rough-In | 8/20/2018 | 8/20/2018 | 8/20/2018 | P | PASS |
Eric Story
|
|
|
Underground to fuel system Phone #: ###-#### Inspection requested via web by Stan Woodward U/G from store ot pumps ok to cover
|
Electrical Rough-In | 8/16/2018 | 8/17/2018 | 8/17/2018 | A | PASS |
Eric Story
|
|
|
Walls for Cover Phone #: ###-#### Inspection requested via web by Stan Woodward Seperating wall amd bath wall and hard lids ok to cover
|
Conference | 8/12/2018 | 8/13/2018 | 8/13/2018 | A | PASS |
Eric Story
|
|
|
Underground rough in Phone #: ###-#### Inspection requested via web by Stan Woodward U/G inside of building only ok to cover
|