Final | 8/28/2018 | 8/31/2018 | 8/31/2018 | A | PASS |
Eric Story
|
|
|
Hot tub Installed and new breaker installed in main panel. Used Tandems to make room in panel. All wire is #6 AWG and grounding is #8 AWG. Phone #: ###-#### Inspection requested via web by Anastacio Fuentes Hot tub final ok
|
Electrical Rough-In | 8/15/2018 | 8/16/2018 | 8/16/2018 | A | PASS |
James Ady
|
|
|
JR Phone #: ###-#### Underground only ok to cover
|