Final | 11/27/2018 | 11/27/2018 | 11/27/2018 | P | PASS |
Mark Moncarr
|
|
|
Home is ready whenever you are available. Thank you! Phone #: ###-#### Inspection requested via web by Eric Brown Ok final. 3/0 blank installed above tub in mstr bath.
|
Electrical Rough-In | 10/26/2018 | 10/26/2018 | 10/26/2018 | P | PASS |
Mark Moncarr
|
|
|
Floor heat in master bathroom. It will be done before noon. Thank you Phone #: ###-#### Inspection requested via web by Eric Brown Ok cover floor heat mstr.
|
Rough-In Permanent Service | 8/20/2018 | 8/20/2018 | 8/20/2018 | A | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by mike brown p/s u/g n ok
|
Electrical Rough-In | 8/16/2018 | 8/17/2018 | 8/17/2018 | A | PASS |
Eric Story
|
|
|
Soffit insp. Thanks Phone #: ###-#### Inspection requested via web by Eric Brown Soffit only around house ok to cover
|