Final | 4/1/2019 | 4/1/2019 | 4/1/2019 | P | PASS |
Mark Moncarr
|
|
|
Code is DAM Ok final.
|
Final | 3/31/2019 | 4/1/2019 | 4/1/2019 | A | CANC |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Tyler Ridley Wrong code given, Re-scheduled with proper code for Mark Moncar for after inspection
|
Electrical Rough-In | 10/17/2018 | 10/18/2018 | 10/18/2018 | A | PASS |
Mark Moncarr
|
|
|
Please contact Electrical Contractor before arrival and he can meet inspector at site. Phone #: ###-#### Inspection requested via web by Tyler Ridley Ok cover bed, kitch, living.
|
Conference | 9/25/2018 | 9/26/2018 | 9/26/2018 | A | DONE |
Mark Moncarr
|
|
|
Tyler ###-#### Meet to discuss work needed. 830am was a good time after talking to contractor. Saw a few items that may need to be addressed. Some panels feeding more than 1 possible tenant space, but only accesible through another seperate tenant space.
|
Conference | 9/25/2018 | 9/25/2018 | 9/25/2018 | P | CANC |
Mark Moncarr
|
|
|
Tyler Phone #: ###-#### Talked to Tyler. Re-scheduled for 9/26/18 at 830am.
|