Information based on query as of Monday, July 8, 2024.
Permit Information
Permit NumberELE18-03253
StatusIssued
Name ARMSTRONG EUGENE M
Site Address 2565 S MILL POINT LN
Project Name 
Customer Number 
ePlanReviewNo
Description
Homeowner Online - Alteration or Repair: install new 3" conduit underground for power to shed
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final12/11/201912/11/201912/11/2019PNH
DetailsJames Ady
Sima Phone #: ###-#### No access will reschedule for 12/12/19
Rough-In Permanent Service9/12/20189/13/20189/13/2018PPASS
DetailsRock A. Hudson
Phone #: ###-#### Inspection requested via web by Wren Van Bockel
Shed to remain unfinished, Owner dedicated 20 amp circuits to each receptacle location, (20) receptacles.
Service- need to move load conduit to right side of meter , Idaho Power needs far left knock out for service lateral chase to meter base of enclosure. Grounding electrode conductor to remain connected.
p/s u/g n ok
Electrical Rough-In9/11/20189/12/20189/12/2018AFAIL
DetailsRock A. Hudson
Phone #: ###-#### Inspection requested via web by Wren Van Bockel
110.27- All wiring located below 8' shall be protected from physical damage. Horizontal runs of NM cable shall be protected.
210.8(A)(2)- All 120 volt 15 and 20 amp receptacle outlets located in storage shed shall have GFCI protection.
250.32(B)- All non-current carrying metal parts shall not be connected to grounded conductor on load side of main disconnect. Seperate grounds and neutrals on shed sub panel.
250.64- Grounding electrode conductor shall be terminated at service location. Owner stated was going to have Idaho Power terminate them, informed they will not terminate any other conductors not associated with line side.
300.12- PVC from service to shed shall be a complete system. LB not secured to panel. Reducing washers needed and lock nuts and bushing.
334.30- NM cable shall be secured with in 12" of panel terminations.
Temporary Service8/27/20188/27/20188/27/2018ACANC
DetailsJames Ady
under ground conduit installed just need to cover Phone #: ###-#### Inspection requested via web by Wren Van Bockel
Electrical Rough-In8/27/20188/27/20188/27/2018PPASS
DetailsJames Ady
under ground conduit installed just need to cover Phone #: ###-#### Inspection requested via web by Wren Van Bockel Underground from shed to ID power transformer only ok to cover
Conference8/27/20188/27/20188/27/2018PPASS
DetailsJames Ady
under ground conduit installed just need to cover Phone #: ###-#### Inspection requested via web by Wren Van Bockel Talked about Disc on shed as well as grounding on service.