Final | 4/16/2019 | 4/16/2019 | 4/16/2019 | P | PASS |
Mark Moncarr
|
|
|
Homeowner will be home any questions please let me know thank you Phone #: ###-#### Inspection requested via web by David Kubik Ok final.
|
Electrical Rough-In | 10/21/2018 | 10/22/2018 | 10/22/2018 | A | PASS |
Mark Moncarr
|
|
|
Any questions please let me know. Thank you. Phone #: ###-#### Inspection requested via web by David Kubik Ok cover garage, utility addition.
|
Permanent Service | 10/18/2018 | 10/19/2018 | 10/19/2018 | A | PASS |
Mark Moncarr
|
|
|
Set meter panel in backyard on pole. Phone #: ###-#### Inspection requested via web by David Kubik 2 ground rods. p/s o/h rec k
|
Electrical Rough-In | 10/3/2018 | 10/4/2018 | 10/4/2018 | A | PASS |
Mark Moncarr
|
|
|
Installed PVC for hot tub and water feature power. Most of the backyard will be all done in concrete. you can walk through the garage to go around back any questions please let me know. Phone #: ###-#### Inspection requested via web by David Kubik Ok cover conduit for water feature and hottub.
|
Electrical Rough-In | 8/26/2018 | 8/27/2018 | 8/27/2018 | A | PASS |
Mark Moncarr
|
|
|
Installed 2 inch PVC for service run. Need ok to cover. Any questions please let me know. Thank you. Phone #: ###-#### Inspection requested via web by David Kubik Ok cover grd work.
|