Final | 7/2/2020 | 7/2/2020 | 7/2/2020 | P | PASS |
Mark Moncarr
|
|
|
Swimming pool electrical final. Access granted through dirt road on the left side of the residence If no answer at door Phone #: ###-#### Inspection requested via web by Lars Johnson Ok final.
|
Final | 6/29/2020 | 6/30/2020 | 6/30/2020 | A | NH |
Mark Moncarr
|
|
|
Swimming pool electrical final Phone #: ###-#### Inspection requested via web by Lars Johnson Knocked at 825, no answer
|
Electrical Rough-In | 3/11/2019 | 3/11/2019 | 3/11/2019 | P | PASS |
Mark Moncarr
|
|
|
EQ bonding for swimming pool Phone #: ###-#### Inspection requested via web by Lars Johnson Ok cover pool perimeter bonding.
|
Electrical Rough-In | 8/28/2018 | 8/29/2018 | 8/29/2018 | A | PASS |
Rock A. Hudson
|
|
|
Underground and bonding for swimming pool Phone #: ###-#### Inspection requested via web by Lars Johnson Bonding stubs all 4 corners and shell back to equipment pad. Underground and bonding rough in ok cover
|