Final | 1/18/2019 | 1/22/2019 | 1/22/2019 | A | PASS |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Heath Thomas... ok to final
|
Electrical Rough-In | 9/18/2018 | 9/18/2018 | 9/18/2018 | P | PASS |
Rock A. Hudson
|
|
|
Overhead garage door will manually open. Front door is to be open as well. Phone #: ###-#### Inspection requested via web by Heath Thomas Main bath has been changed to 2 seperate basins, shall have receptacle outlets installed for each basin on a dedicated circuit for bathroom receptacles. May be fished in. Kitchen, master bed and bathroom, hall bath Rough in ok.cover
|
Electrical Rough-In | 9/17/2018 | 9/18/2018 | 9/18/2018 | A | NH |
Rock A. Hudson
|
|
|
Addition to rear of house and remodel of existing. Branch circuits for kitchen appliances, lights and outlets. Please contact Jason @ ###-#### with any questions. Phone #: ###-#### Inspection requested via web by Heath Thomas No answer at door all other door secured, no access. Called contact left message.
|
Permanent Service | 8/29/2018 | 8/29/2018 | 8/29/2018 | P | PASS |
Mark Moncarr
|
|
|
Main service change. Power shut down today. We will contact when ready for the inspection. Contact Heath @ ###-#### with any questions. Phone #: ###-#### Inspection requested via web by Heath Thomas p/s o/h rec ok
|