Final | 8/30/2018 | 8/30/2018 | 8/30/2018 | A | PASS |
Tom Saunders
|
|
|
The meters are labeled, including the HOUSE thanks Brad Phone #: ###-#### Inspection requested via web by Brad Baker....
meter pack..no further inspection needed...ok to final
|
Permanent Service | 8/29/2018 | 8/30/2018 | 8/30/2018 | A | PASS |
Tom Saunders
|
|
|
The meters are labeled, including the HOUSE thanks Brad Phone #: ###-#### Inspection requested via web by Brad Baker...
p/s reconnect ok
|
Permanent Service | 8/28/2018 | 8/29/2018 | 8/29/2018 | A | NR |
Tom Saunders
|
|
|
inspect the house meter to be re-energized Phone #: ###-#### Inspection requested via web by Brad Baker...meter pack needs labelled and house panel circuits
|