Final | 1/3/2019 | 1/4/2019 | 1/4/2019 | A | PASS |
James Ady
|
|
|
Final Inspection for B17C Executive Suites. Contact electrician on site - Ron Chaney or Pierce Bouge. Thank you. Phone #: ###-#### Inspection requested via web by Cathy Duchek corrections made final ok
|
Final | 1/2/2019 | 1/2/2019 | 1/2/2019 | P | PART |
James Ady
|
|
|
Final inspection in B17C Executive Suites. Please contact Ron Chaney or Pierce Bouge. Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Lock out for insta hot, Dish washer pig tail and Updated panel schedule needed for final. Partial final ok
|
Electrical Rough-In | 12/18/2018 | 12/20/2018 | 12/20/2018 | A | PASS |
Eric Story
|
|
|
Ceiling Inspection for cover in B17C Executive Suite Contact Ron Chaney Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek
Ceiling only ok to cover
|
Electrical Rough-In | 12/7/2018 | 12/10/2018 | 12/10/2018 | P | PASS |
James Ady
|
|
|
Ceiling Inspection for cover Contact Pierce Bouge Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek A/V room and Servery noty ready. All other ceilings ok to cover
|
Electrical Rough-In | 9/26/2018 | 9/27/2018 | 9/27/2018 | A | PASS |
James Ady
|
|
|
Wall rough in inspection for B17C Executive Suites Contact Pierce Bouge Thank you Phone #: ###-#### Inspection requested via web by Tom Betty Discussed Requirments of 210.71B1 and 2. Furniture receps will make up quantity needed in Large meeting room. Will need 3 floor receps in Large room and 1 in smaller room. Walls only ok to cover
|