Final | 9/4/2018 | 9/6/2018 | 9/6/2018 | A | PASS |
James Ady
|
|
|
Hot tub is ready for inspection. Spa disconnect installed, fed from 40 amp breaker. Receptacle installed within 10'' of tub, schedule 80 PVC conduit run through planter covered with block pavers. Metal gutter bonded with #8 bare cu. back to spa panel. Phone #: ###-#### Inspection requested via web by Kurt Carlson Final ok
|
Electrical Rough-In | 9/6/2018 | 9/6/2018 | 9/6/2018 | P | PASS |
James Ady
|
|
|
Hot tub is ready for inspection. Spa disconnect installed, fed from 40 amp breaker. Receptacle installed within 10'' of tub, schedule 80 PVC conduit run through planter covered with block pavers. Metal gutter bonded with #8 bare cu. back to spa panel. Phone #: ###-#### Inspection requested via web by Kurt Carlson rough in ok
|