Final | 7/10/2019 | 7/10/2019 | 7/10/2019 | P | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by William Andrews Ok final. Unit was a B&B, could not access all recepts. 2 blanks were needed on furnace front downstairs, and brkr changed for mini split. Both were done, contractor was there.
|
Electrical Rough-In | 10/24/2018 | 10/24/2018 | 10/24/2018 | P | PASS |
Mark Moncarr
|
|
|
Floor heat master bath. Phone #: ###-#### Inspection requested via web by William Andrews Ok cover floor heat mstr.
|
Electrical Rough-In | 9/27/2018 | 9/27/2018 | 9/27/2018 | P | PASS |
Mark Moncarr
|
|
|
Lockbox on backdoor 6189 Phone #: ###-#### Inspection requested via web by William Andrews Ok cover. Multiple areas fished in. Will check on final.
|
Permanent Service | 9/14/2018 | 9/14/2018 | 9/14/2018 | A | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by William Andrews p/s o/h n ok
|