Final | 1/11/2019 | 1/14/2019 | 1/14/2019 | A | PASS |
Rock A. Hudson
|
|
|
Contact: Josh Mangum Phone #: ###-#### Inspection requested via web by Deb Gooden Only damaged feeders found supply Knitting Factory panels and have been locked out while others have been energized. Final ok
|
Permanent Service | 9/12/2018 | 9/12/2018 | 9/12/2018 | P | PASS |
Rock A. Hudson
|
|
|
Contact: Josh Mangum Phone #: ###-#### Inspection requested via web by Deb Gooden Permit to check out equipment damaged by Knitting Factory damage mostly to mezzanine to offices located above. Electrical room at mezzanine level wet from putting out fire and has branch circuit damage. Contactor to lockout all associated with knitting factory. Idaho power to energize main gear and electrical contractor to verify each tenant space feeders ok prior to energizing. p/s u/g rec ok
|