Final | 10/18/2018 | 10/19/2018 | 10/19/2018 | A | PASS |
Tom Saunders
|
|
|
I will be there working by 8:15am. Phone #: ###-#### Inspection requested via web by Craig Korell...ok to final
|
Final | 10/10/2018 | 10/10/2018 | 10/10/2018 | P | NH |
Mark Moncarr
|
|
|
The gate is unlocked on the right side of the house. There aren’t any animals. I apologize there is a little bit of mud left over from the trench digging. But you should find everything in order. Phone #: ###-#### Inspection requested via web by Craig Korell Knocked on door no answer. Talked to Craig, he is going to coordinate a time to meet and do final inspection.
|
Electrical Rough-In | 10/2/2018 | 10/3/2018 | 10/3/2018 | A | PASS |
Eric Story
|
|
|
It’s the trench in the backyard. Feel free to walk around the right side of the house and open the gate. There aren’t any animals. Phone #: ###-#### Inspection requested via web by Craig Korell U/G for detached shed ok to cover
|
Permanent Service | 9/20/2018 | 9/24/2018 | 9/24/2018 | P | PASS |
Mark Moncarr
|
|
|
I will be doing a service change that day. I should be ready by the afternoon. Thanks Phone #: ###-#### Inspection requested via web by Craig Korell p/s o/h rec ok
|
Electrical Rough-In | 9/13/2018 | 9/14/2018 | 9/14/2018 | A | PASS |
Eric Story
|
|
|
I will need to meet you there. I have some questions about the rest of the project. I can be there with 15 minutes notice. Phone #: ###-#### Inspection requested via web by Craig Korell Contractor will get a ground rod for final on detached building Shed only ok to cover
|