Final | 10/14/2018 | 10/15/2018 | 10/15/2018 | A | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Ron Zimmerman Final ok
|
Final | 10/11/2018 | 10/12/2018 | 10/12/2018 | A | FAIL |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Ron Zimmerman 210.8(B)- Receptacles located within 6' of a sink shall have GFCI protection. Exam room
|
Electrical Rough-In | 9/17/2018 | 9/17/2018 | 9/17/2018 | A | PART |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Ron Zimmerman Walls covered with drywall prior to inspection, Confirmed medical grade MC used in exam room and EMT used on existing receptacle location however an equipment ground needs added to existing EMT runs to be complient. No issues with reception area only exam room. Will not require removal of drywall due to minimal work performed. Will check existing receptacles on final.
|
Electrical Rough-In | 9/14/2018 | 9/14/2018 | 9/14/2018 | P | FAIL |
Rock A. Hudson
|
|
|
Ron Phone #: ###-#### 517.13- Wiring methods in patient care space shall have a effective ground fault current path to all receptacle and switch locations with in patient care space. Confirm all receptacles and the switch in exam room E contain proper wiring method. Did not leave correction on site had verbal with Ron.
|