Final | 12/13/2018 | 12/14/2018 | 12/14/2018 | A | PASS |
Daryl DeGrange
|
|
|
We don''t have access to the bank until 9 when they open. Phone #: ###-#### Inspection requested via web by Jim Noll job complete, final ok
|
Electrical Rough-In | 11/12/2018 | 11/13/2018 | 11/13/2018 | A | PASS |
Daryl DeGrange
|
|
|
Ceiling inspection request Phone #: ###-#### Inspection requested via web by Jim Noll rough-in ceiling grid ok cover
|
Conference | 10/19/2018 | 10/19/2018 | 10/19/2018 | P | PASS |
Daryl DeGrange
|
|
|
Call Jim Noll at ###-#### prior to arriving at job site Phone #: ###-#### Inspection requested via web by Scott Campbell Discuss rough-in inspection
|
Electrical Rough-In | 10/19/2018 | 10/19/2018 | 10/19/2018 | P | PASS |
Daryl DeGrange
|
|
|
Call Jim Noll at ###-#### prior to arriving at job site Phone #: ###-#### Inspection requested via web by Scott Campbell Rough-in ok cover front office area half walls, Back office walls
|
Electrical Rough-In | 10/9/2018 | 10/9/2018 | 10/9/2018 | A | PASS |
Rock A. Hudson
|
|
|
NEW TELLER DESK AREA IN FRONT LOBBY OF THE BANK. Phone #: ###-#### Inspection requested via web by Jim Noll New teller area walls only, remove floor receptacle south wall, rough in ok cover
|