Final | 9/21/2018 | 9/24/2018 | 9/24/2018 | A | PASS |
Eric Story
|
|
|
The final was already done. I''m requesting this so it can be marked off. Phone #: ###-#### Inspection requested via web by Rocky Longden Final completed as per James Ady
|
Electrical Rough-In | 9/20/2018 | 9/20/2018 | 9/20/2018 | P | PASS |
James Ady
|
|
|
Rocky Phone #: ###-#### final ok
|
Electrical Rough-In | 9/20/2018 | 9/20/2018 | 9/20/2018 | P | PASS |
James Ady
|
|
|
Rocky Phone #: ###-#### listing of equipment ok
|
Electrical Rough-In | 9/14/2018 | 9/17/2018 | 9/17/2018 | A | FAIL |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Rocky Longden No papaerwork onsite. system installed prior to inspection
|