Final | 9/19/2018 | 9/21/2018 | 9/21/2018 | P | PASS |
Mark Moncarr
|
|
|
Alicia-would like as late as possible Phone #: ###-#### Panel mounted and existing power used. New 100a replaceing existing 100a zinsco panel. Most grounds and neutrals landed. Work looked good for energize. p/s u/g rec ok
|
Conference | 9/17/2018 | 9/18/2018 | 9/18/2018 | P | DONE |
Mark Moncarr
|
|
|
Alicia Phone #: ###-#### Discussed replacing existing panel with new. Grounds and neutrals not to be seperated. Cannot put more than 1 neutral per terminal.
|