Final | 12/5/2018 | 12/6/2018 | 12/6/2018 | A | PASS |
James Ady
|
|
|
Tobias is the site contact. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker Corrections made final ok
|
Final | 12/4/2018 | 12/5/2018 | 12/5/2018 | P | FAIL |
James Ady
|
|
|
Tobias is the site contact. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker Receps within 6ft of sink shall be GFCI protected(Left of breakroom sink) Wearhouse bath and storage lights dead.
|
Electrical Rough-In | 11/5/2018 | 11/5/2018 | 11/5/2018 | P | PASS |
James Ady
|
|
|
We need a ceiling inspection. Jeff is the site contact. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker ceiling ok to cover
|
Electrical Rough-In | 10/5/2018 | 10/8/2018 | 10/8/2018 | P | PASS |
James Ady
|
|
|
We need a wall rough inspection. Tobias is the site contact. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker walls only rough in ok
|
Electrical Rough-In | 10/1/2018 | 10/1/2018 | 10/1/2018 | A | CANC |
James Ady
|
|
|
We need a wall rough. Jeff is the site contact. Phone #: ###-#### Inspection requested via web by Stacie Tasker
|
Electrical Rough-In | 9/18/2018 | 9/19/2018 | 9/19/2018 | P | PASS |
James Ady
|
|
|
We need a trench inspection, Tobias is the site contact. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker Underground to floor box only ok to cover
|