Final | 5/22/2019 | 5/23/2019 | 5/23/2019 | A | PASS |
James Ady
|
|
|
Final Inspection at Tray Wash Area Contact Pierre Elskamp Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek final ok
|
Electrical Rough-In | 5/10/2019 | 5/10/2019 | 5/10/2019 | P | PART |
James Ady
|
|
|
Partial Ceiling Inspection Bldg 17C, wash rack area. Contact Pierre Elskamp Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Hall and area over equipment only ok to cover will leave tiles out where equipment j boxes are.
|
Electrical Rough-In | 4/23/2019 | 4/25/2019 | 4/25/2019 | A | PASS |
James Ady
|
|
|
Rough In for cover in the Cafeteria Contact Pierre Elskamp Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek 1 switch and 1 recep ok to cover
|
Final | 10/16/2018 | 10/17/2018 | 10/17/2018 | A | PART |
James Ady
|
|
|
Ceiling/Partial Final for the Servery at the B17C Cafeteria. Contact Pierre Elskamp. Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Patial final servery only ok to cover
|
Electrical Rough-In | 10/2/2018 | 10/3/2018 | 10/3/2018 | P | PASS |
James Ady
|
|
|
Storage closet cafetorium ceilings and walls Contact Eric Cobiskey Thank you Phone #: ###-#### Inspection requested via web by Tom Betty Lid only rough in ok
|
Final | 9/19/2018 | 9/19/2018 | 9/19/2018 | P | PART |
James Ady
|
|
|
Partial Final - Final for Vending Area only Contact Pierre Elskamp Thank you Thank you James for getting the other inspections moved over. I appreciate your help. Phone #: ###-#### Inspection requested via web by Tom Betty partial final ok
|
Electrical Rough-In | 9/17/2018 | 9/18/2018 | 9/18/2018 | A | PASS |
James Ady
|
|
|
Partial ceiling inspection in server area Contact Pierre Elskamp Thank you, Phone #: ###-#### Inspection requested via web by Tom Betty Ansul and front door ceiling not ready rest ok to cover
|
Electrical Rough-In | 9/10/2018 | 9/11/2018 | 9/11/2018 | P | PASS |
James Ady
|
|
|
B17C Cafeteria Hard lid inspection in servery food prep area. Contact Pierre Elskamp Thank you, Phone #: ###-#### Inspection requested via web by Tom Betty Soffit area above tiled wall only ok to cover
|
Electrical Rough-In | 8/23/2018 | 8/24/2018 | 8/24/2018 | P | PASS |
James Ady
|
|
|
Wall inspection for cover in the vending area. Contact Pierre Elskamp Thank you, Phone #: ###-#### Inspection requested via web by Tom Betty ok to cover
|
Electrical Rough-In | 8/20/2018 | 8/20/2018 | 8/20/2018 | P | PASS |
James Ady
|
|
|
Wall and ceiling inspection in Cafeteria storage closets Early afternoon okay....call electrician on site - Pierre Elskamp. Thank you, Phone #: ###-#### Inspection requested via web by Tom Betty Listed areas of storage closets only ok yo cover
|
Electrical Rough-In | 8/15/2018 | 8/16/2018 | 8/16/2018 | A | PASS |
James Ady
|
|
|
B17C Cafeteria serving underground and area wall rough in Contact Pierre Elskamp Thank you Phone #: ###-#### Inspection requested via web by Tom Betty Underground and N and E walls. Sink and micro wall next to ice maker ok to cover345
|