Final | 10/18/2018 | 10/19/2018 | 10/19/2018 | A | PASS |
Tom Saunders
|
|
|
lease call our office when on the way so we can let the homeowner aware and call Wayne with any questions at ###-####. Phone #: ###-#### Inspection requested via web by William Salts... ok to final
|
Final | 10/17/2018 | 10/18/2018 | 10/18/2018 | A | NR |
Tom Saunders
|
|
|
Please call our office when on the way so we can let the homeowner aware and call Wayne with any questions at ###-####. Phone #: ###-#### Inspection requested via web by William Salts...rescheduled for next day 10/19/18 for AM
|
Permanent Service | 10/5/2018 | 10/9/2018 | 10/9/2018 | P | PASS |
Rock A. Hudson
|
|
|
Please inspect in late afternoon and call Wayne when headed there at ###-#### to make sure we''re ready. If possible please call Kaden as well at ###-####. Phone #: ###-#### Inspection requested via web by William Salts Changed plan to a 200 amp service change with 125 for house, 60 amp to back shed. p/s u/g rec ok
|
Conference | 9/27/2018 | 9/28/2018 | 9/28/2018 | P | PASS |
Rock A. Hudson
|
|
|
Please call Kaden at ###-#### 15-20min before arriving in order to meet at job location. Phone #: ###-#### Inspection requested via web by William Salts Discussed options for service change with 200 amp for house and 200 for future additions. A single conduit has been installed to house from ground box provided by Idaho Power. Contractor to look at possible service on rack at ground box and subfeed gutter on house if conduit fill will allow. Confirmed all subfeeds on load side of service will reastablish ground at each seperate structure. Confirmed available grounding electrodes shall be used. Existing service on house has #6 from meter to 100 amp disconnect and 3 conductors feeding sub panel in house.
|
Electrical Rough-In | 9/19/2018 | 9/19/2018 | 9/19/2018 | P | PASS |
Mark Moncarr
|
|
|
Please call Wayne at ###-#### or Kaden at ###-#### with any questions. Phone #: ###-#### Inspection requested via web by William Salts Ok cover shed.
|