Final | 11/23/2018 | 11/26/2018 | 11/26/2018 | A | PASS |
Eric Story
|
|
|
Homeowner should be there, and the side door to the garage will be unlocked as well. That area is empty and separate from the rest of the house. Phone #: ###-#### Inspection requested via web by Troy Cobb Final ok
|
Final | 11/22/2018 | 11/23/2018 | 11/23/2018 | A | NH |
Daryl DeGrange
|
|
|
Phone #: ###-#### Inspection requested via web by Troy Cobb No Access, nobody home, no answer on phone
|
Final | 11/21/2018 | 11/21/2018 | 11/21/2018 | P | FAIL |
Eric Story
|
|
|
Homeowner should be there and side door to garage should be unlocked Phone #: ###-#### Inspection requested via web by Troy Cobb Arc Fault protection for bedrooms Uffer inspection plate needs finished and accesible
|
Permanent Service | 10/3/2018 | 10/4/2018 | 10/4/2018 | P | CANC |
Eric Story
|
|
|
Change-over is done now. the original breaker panel has been gutted and turned into a j-box. New all-in-one panel is wired and ready for final Phone #: ###-#### Inspection requested via web by Troy Cobb Permanent service already given and cannot final permit as requested
|
Electrical Rough-In | 10/3/2018 | 10/4/2018 | 10/4/2018 | P | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Troy Cobb Garage and room addition ok to cover
|
Permanent Service | 9/21/2018 | 9/24/2018 | 9/24/2018 | P | PASS |
Eric Story
|
|
|
Just need to get approval to energize new service equipment. I''ll contact Idaho Power when we are ready to do the change-over, and schedule a final inspection for the service equipment after that''s done. Phone #: ###-#### Inspection requested via web by Troy Cobb p/s o/h rec ok
|