Final | 7/19/2019 | 7/19/2019 | 7/19/2019 | P | PASS |
Mark Moncarr
|
|
|
radiant floor // Christina Phone #: ###-#### Ok final.
|
Electrical Rough-In | 6/12/2019 | 6/14/2019 | 6/14/2019 | P | CANC |
Mark Moncarr
|
|
|
Christina Phone #: ###-#### Existing flr heat was cut and spliced. Talked to homeowner and she is thinking about doing base board heating in place of flr heat.
|
Final | 9/20/2018 | 9/21/2018 | 9/21/2018 | P | CANC |
Mark Moncarr
|
|
|
inspection for rough in on radiant heating. Phone #: ###-#### Inspection requested via web by Michael Wagner Should have been RI for floor heat down bath. Cancelled final inspection.
|
Electrical Rough-In | 9/21/2018 | 9/21/2018 | 9/21/2018 | P | PASS |
Mark Moncarr
|
|
|
Ok cover floor heat downstairs bath. ###-####
|
Rough-In Permanent Service | 9/20/2018 | 9/21/2018 | 9/21/2018 | A | CANC |
Mark Moncarr
|
|
|
Rough in for radiant flooring Phone #: ###-#### >> Inspection requested via web by Michael Wagner
|