Final | 12/28/2018 | 12/31/2018 | 12/31/2018 | A | PASS |
Mark Moncarr
|
|
|
Inspect = kitchen remodel and garage outlet.
* I will be there at 8:15- 8:30 Thank you, Lonnie Phone #: ###-#### Inspection requested via web by Lonnie Sorichta Ok final. Lockouts for DW and hood installed.
|
Electrical Rough-In | 10/7/2018 | 10/8/2018 | 10/8/2018 | A | PASS |
James Ady
|
|
|
Kitchen Remodel - Inspect walls for sheet rock cover, outlets that were relocated and lights that were added.
* I will be there at 8:30. Thank you, Lonnie Phone #: ###-#### Inspection requested via web by Lonnie Sorichta Kitchen only ok to cover
|
Electrical Rough-In | 10/4/2018 | 10/5/2018 | 10/5/2018 | P | CANC |
James Ady
|
|
|
Inspect a kitchen wall for sheet rock cover.
* Late as possible, please. Thank you, Lonnie Phone #: ###-#### >> Inspection requested via web by Lonnie Sorichta Inspection cancelled from web by: Lonnie Sorichta
|