Final | 10/19/2018 | 10/22/2018 | 10/22/2018 | A | PASS |
Mark Moncarr
|
|
|
Please call ahead as much time as you can occupied building and need to have the homeowner let you in the garage to inspect the inside Phone #: ###-#### Inspection requested via web by TRENT Swaim Ok final. Corrections made.
|
Final | 10/10/2018 | 10/11/2018 | 10/11/2018 | A | FAIL |
Eric Story
|
|
|
Please call ahead if possible ###-#### Phone #: ###-#### Inspection requested via web by TRENT Swaim Conductors ran in wall shall be encased in a raceway(Solar ) Strain relief for conductors in J-Box Labeling of all Solar conduits and J-Boxes
|
Conference | 9/24/2018 | 9/24/2018 | 9/24/2018 | P | DONE |
Mark Moncarr
|
|
|
Inspection requested via web by TRENT Swaim Discussed new overhead to re-feed existing service. Talked to contractor about coordinating with IDP.
|