Final | 12/5/2018 | 12/6/2018 | 12/6/2018 | A | PASS |
James Ady
|
|
|
Tobias is the site contact. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker Corrections made final ok
|
Final | 12/4/2018 | 12/5/2018 | 12/5/2018 | P | FAIL |
James Ady
|
|
|
Tobias is the site contact. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker Boxes set back more than 1/4in shall have sparkrings, (Front area) All wiring shall terminate in boxes( reception desk )
|
Electrical Rough-In | 11/21/2018 | 11/21/2018 | 11/21/2018 | P | PASS |
James Ady
|
|
|
We need a grid inspection. Tobias is the site contact Phone #: ###-#### Inspection requested via web by Stacie Tasker Ceiling only ok to cover
|
Electrical Rough-In | 10/29/2018 | 10/30/2018 | 10/30/2018 | P | PASS |
James Ady
|
|
|
We need a ceiling inspection. Tobias is the contact. Phone #: ###-#### Inspection requested via web by Stacie Tasker Zippered door in netting to access panel boards ok. Rotation of transformer to clear Support cable ok hard lids in restroom ok to cover
|
Electrical Rough-In | 10/12/2018 | 10/15/2018 | 10/15/2018 | P | PASS |
James Ady
|
|
|
We need a wall rough, Jeff is the site contact. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker walls only ok to cover
|
Electrical Rough-In | 10/9/2018 | 10/10/2018 | 10/10/2018 | A | PASS |
James Ady
|
|
|
We need a ceiling inspection, Jeff is the site contact. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker Checker lighting in batting cage area for final Lighting only ok.
|