Final | 10/3/2018 | 10/4/2018 | 10/4/2018 | P | PASS |
Mark Moncarr
|
|
|
Final Inspection any questions please call Louis at ###-#### Phone #: ###-#### Inspection requested via web by Louis Keller Ok final. Ground bar installed for grounds at bottom of panel. Ground rod driven, and jumper installed.
|
Permanent Service | 9/24/2018 | 10/1/2018 | 10/1/2018 | A | FAIL |
Rock A. Hudson
|
|
|
Perm Service Inspection for replacing Main Breaker. Any questions please call Jordan At ###-#### Phone #: ###-#### Inspection requested via web by Louis Keller 250.24- Main bonding jumper shall be installed to connect panel can to grounding and grounded conductors, 250.53(A)(2)- Metal underground water pipe grounding electrode system shall be supplemented by an additional ground rod. 250.66- Grounding electrode conductor splice shall be of minimum size to grounded conductor connection.
|