Conference | 5/21/2019 | 5/23/2019 | 5/22/2019 | P | DONE |
Mark Moncarr
|
|
|
Scheduling this per inspector''s request re: cancellation of this inspection. The problems were subsequently addressed in the now finalized ELE18-03772 permit. Thank you. Phone #: ###-#### Inspection requested via web by Josh Pennington This is to close out homeowner permit. An electrical contractor pulled permit and took job over. Job is finaled out.
|
Electrical Rough-In | 10/1/2018 | 10/2/2018 | 10/2/2018 | A | FAIL |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Josh Pennington 1. 110.26 Gas meter located in front of new panel location. Could present unsafe working clearance. 2. 250.104(B) Metal conduit feeding meter to new panel needs bonded on accessible side. 3. Verify size of SER feeding interior panel. 4. Verify GEC termination to ground rod or UFER. If cannot verify, 2 ground rods will be installed. 5. Any box mounted with unacceptable means, wil need to be replaced with new. 2 gang back of house is mounted with screws through side of box. 6. It appears IDP meter tab has been tampered with. It looks like metal clip has been pulled apart and re-inserted.
|