Final | 3/15/2019 | 3/18/2019 | 3/18/2019 | A | PASS |
Mark Moncarr
|
|
|
James Phone #: ###-#### Ok final. Bushings used, grounding identified, grds and neut seperated in shop panel.
|
Permanent Service | 3/11/2019 | 3/12/2019 | 3/12/2019 | A | PASS |
Mark Moncarr
|
|
|
James Phone #: ###-#### p/s o/h n ok
|
Permanent Service | 3/7/2019 | 3/8/2019 | 3/8/2019 | A | FAIL |
Mark Moncarr
|
|
|
James Phone #: ###-#### 200a feed through meter main used. Need 100a 2-pole brkr placed below 200a main. Wires terminated on feed through lugs are sized for a 100a panel. Also need equipt ground wire, and attach grounding electrode conductor to 2nd ground rod.
|
Electrical Rough-In | 1/14/2019 | 1/14/2019 | 1/14/2019 | P | NR |
Mark Moncarr
|
|
|
James-forgot to call in the conference call-still needs R.I.-please call to meet and for direction Phone #: ###-####
|