Final | 5/13/2019 | 5/15/2019 | 5/15/2019 | P | PASS |
Mark Moncarr
|
|
|
Building contractor should be there to let you into the garage, Jason "Foothills construction"###-####. Thank you Phone #: ###-#### Inspection requested via web by todd cline Ok final garage.
|
Electrical Rough-In | 12/18/2018 | 12/18/2018 | 12/18/2018 | A | PASS |
Mark Moncarr
|
|
|
Requesting a rough in for garage. Also called in a final for same property different permit. Thanks Todd Phone #: ###-#### Inspection requested via web by todd cline Ok cover. All interior pulled in MC. There is a panel inside with 2 circuits. 1 for recepts, 1 for lighting.
|
Electrical Rough-In | 10/1/2018 | 10/2/2018 | 10/1/2018 | A | CANC |
Mark Moncarr
|
|
|
Phone #: ###-#### >> Inspection requested via web by Josh Pennington Inspection cancelled from web by: Josh Pennington
|