Final | 12/10/2018 | 12/11/2018 | 12/11/2018 | P | PASS |
James Ady
|
|
|
Taylor with CK rogers will be there in the afternoon to let you in. If you could call me 30 min before you head there or call me on the way so I can make sure he is there. Phone #: ###-#### Inspection requested via web by Neal Rumsey final ok
|
Electrical Rough-In | 10/31/2018 | 11/1/2018 | 11/1/2018 | P | PASS |
James Ady
|
|
|
floor heat in the bathroom, the tile people will be in the bathroom to show you. Phone #: ###-#### Inspection requested via web by Neal Rumsey Master bath floor hea only ok to cover
|
Electrical Rough-In | 9/26/2018 | 9/27/2018 | 9/27/2018 | A | PASS |
Daryl DeGrange
|
|
|
Master bathroom Phone #: ###-#### Inspection requested via web by Neal Rumsey Rough-in ok cover
|