Conference | 9/27/2018 | 9/28/2018 | 9/28/2018 | P | PASS |
Mark Moncarr
|
|
|
Would like to do this Friday am sometime. Preferably before 12:00. Thanks Phone #: ###-#### Inspection requested via web by Shane Cobb Work already done. All work looks good. Correct brkr size, fuse size and wire. Convienece outlet within range.
|
Final | 9/28/2018 | 9/28/2018 | 9/28/2018 | P | PASS |
Mark Moncarr
|
|
|
Ok final. All wire size, fuses and brkr size correct.
|