Final | 12/18/2018 | 12/18/2018 | 12/18/2018 | A | PASS |
Mark Moncarr
|
|
|
Requesting a final on outside outlets and lights.thanks Phone #: ###-#### Inspection requested via web by todd cline Ok final recepts on outside of house. Everything GFI protected and WR/TR.
|
Electrical Rough-In | 11/14/2018 | 11/14/2018 | 11/14/2018 | A | PASS |
Mark Moncarr
|
|
|
Request an ok to cover on pipe in trench, please Phone #: ###-#### Inspection requested via web by todd cline Ok cover trench house to garage.
|
Electrical Rough-In | 10/29/2018 | 10/30/2018 | 10/30/2018 | A | PASS |
Mark Moncarr
|
|
|
Requesting a ok to cover south side of house, please Phone #: ###-#### Inspection requested via web by todd cline Ok cover S side of exterior of house. All existing knob and tube have barriers installed to avoid contact with insulation
|
Electrical Rough-In | 10/26/2018 | 10/26/2018 | 10/26/2018 | A | PASS |
Mark Moncarr
|
|
|
Request a rough in for the front of the house, please Phone #: ###-#### Inspection requested via web by todd cline Ok cover E side exterior of home. All insulation removed in bays that have knob and tube wiring that runs vertical. In bays where horizontal, insulation is blocked off from contact with any wiring.
|
Electrical Rough-In | 10/11/2018 | 10/12/2018 | 10/12/2018 | A | PASS |
Eric Story
|
|
|
requesting an ok to cover for two outlets on the new upper deck, and the wiring and light on the north side of the house Phone #: ###-#### Inspection requested via web by todd cline receptacles up on roof for mini split units ok to cover and light on north end of home ok
|
Permanent Service | 10/2/2018 | 10/3/2018 | 10/3/2018 | A | PASS |
Mark Moncarr
|
|
|
This is a reinspection Phone #: ###-#### Inspection requested via web by todd cline Corrections made. Service already energized.
|