Final | 12/24/2018 | 12/24/2018 | 12/24/2018 | P | PASS |
Eric Story
|
|
|
Removed existing fire panel and security panel. Rerouted receptacle and lighting circuits according to new wall layout. Added outlets in center wall and data outlets. No new circuits. Phone #: ###-#### Inspection requested via web by Sean Patton Occ card signed and final ok
|
Electrical Rough-In | 10/31/2018 | 10/31/2018 | 10/31/2018 | P | CANC |
Eric Story
|
|
|
Approval for cover in two SE offices. 8 LED layins were added after separation wall was moved. Lots of data and FA remain above lid. This will be removed/abandoned once new system is approved. Phone #: ###-#### Inspection requested via web by Sean Patton Need to verify Temp OCC is given, cannot find any history of such given and have spoke with all inspectors and they are aware of this issue and are trying resolve it as well.
|
Electrical Rough-In | 10/4/2018 | 10/4/2018 | 10/4/2018 | A | PASS |
Eric Story
|
|
|
Wall rough in inspection for three display walls added to North suite. Will be ready for inspection by 9:30 Phone #: ###-#### Inspection requested via web by Sean Patton 3 interoir walls added ok to cover
|