Final | 10/17/2018 | 10/17/2018 | 10/17/2018 | P | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Kevin Perez Final ok
|
Electrical Rough-In | 10/15/2018 | 10/15/2018 | 10/15/2018 | P | PASS |
James Ady
|
|
|
Ceiling inspection Phone #: ###-#### Inspection requested via web by Kevin Perez ceiling only ok to cover
|
Electrical Rough-In | 10/11/2018 | 10/12/2018 | 10/12/2018 | P | FAIL |
James Ady
|
|
|
Ceiling inspection for rough-in Phone #: ###-#### Inspection requested via web by Kevin Perez 300.11 cables shall not be supported by ceiling grid. ( Low voltage cables) Lighting ok
|
Electrical Rough-In | 10/5/2018 | 10/8/2018 | 10/8/2018 | P | CANC |
James Ady
|
|
|
Wall Rough-In inspection Phone #: ###-#### >> Inspection requested via web by Kevin Perez Inspection cancelled from web by: Kevin Perez
|