Final | 11/14/2018 | 11/15/2018 | 11/15/2018 | A | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by BRS Permitting Solar array final ok
|
Electrical Rough-In | 11/14/2018 | 11/14/2018 | 11/14/2018 | P | CANC |
Eric Story
|
|
|
Phone #: ###-#### >> Inspection requested via web by BRS Permitting Inspection cancelled from web by: BRS Permitting
|
Final | 10/29/2018 | 10/30/2018 | 10/29/2018 | A | CANC |
Eric Story
|
|
|
Phone #: ###-#### >> Inspection requested via web by BRS Permitting Inspection cancelled from web by: BRS Permitting
|
Electrical Rough-In | 10/12/2018 | 10/15/2018 | 10/15/2018 | A | PASS |
Eric Story
|
|
|
Taylor Barton " ###-####" Phone #: ###-#### Inspection requested via web by BRS PermittingVerified listing and scope of work on Solar Array install also did a conference on line side tap, If a disc of power is needed to perform tap the service will need to be redone to current code due to it not up to code ......
|