Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberELE18-03868
StatusFinaled
Name JRM CONSTRUCTION
Site Address 4425 W QUAIL POINT CT
Project Name 
Customer Number 
ePlanReviewNo
Description
Alteration or Repair: electrical wiring,rewiring, repair, add
circuit.......etc
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final6/7/20196/7/20196/7/2019PPASS
DetailsEric Story
Eric, per our conversation the three items are addressed. The requested data on the Eaton arc fault combo is taped to the inside panel door.
anytime after 1 pm works. If no one is there please call for door code. Phone #: ###-#### Inspection requested via web by accounts payable
Corrections fixed
Moved cabinet left side of panel, replace covers for rain spray,lockouts and documentation of combo type breakers installed.....
Final6/6/20196/6/20196/6/2019PFAIL
DetailsEric Story
Mark, house is unoccupied, partial staging in the home. Please call for garage door code and any questions that may arise. Thank you again for your time and valuable input. Premise will ready after noon today. Phone #: ###-#### Inspection requested via web by accounts payable
406.9 In Use type covers required for outdoor receptacles when subject to rain spray
110.25 Lockable Disc required for all hard wired appliances(dishwasher,micro,double oven)
110.26(a)(2) Working space for electrical equipment is 30" from one side or panelboard...
Rough-In Permanent Service4/3/20194/3/20194/3/2019PPASS
DetailsMark Moncarr
Load center change/upgrade , garage rough-in. If possible please after 3 pm. Thank you Phone #: ###-#### Inspection requested via web by accounts payable p/s u/g rec ok
Electrical Rough-In3/20/20193/20/20193/20/2019APASS
DetailsMark Moncarr
Underground rough in for short section of conduit. from steps to feature. Running East and West. in the back yard. Pictures submitted. Phone #: ###-#### Inspection requested via web by accounts payable I received pics from electrician. Ok cover conduit. All locations 18" or more. Spots that are less in depth will have concrete slab over top. Concrete needed to stay on schedule.
Electrical Rough-In12/21/201812/21/201812/21/2018PPASS
DetailsEric Story
patio conduit rough-in for burial /cover. anytime after 11:45 am should work.. Thank you and thank you for your time. Phone #: ###-#### Inspection requested via web by accounts payable
Back patio U/G ok to cover
Electrical Rough-In11/8/201811/9/201811/9/2018PPASS
DetailsMark Moncarr
Hi Mark, Everything is made up except one duplex in the master bedroom, drywall sheets was blocking it. Thank you for all your support. Please let me know if there is anything you see I need to address, I''ll be happy to do it. Phone #: ###-#### Inspection requested via web by accounts payable Already sheetrocked. Allowed contractor to cover house. Wiring was up to code in all areas. This was another RI inspection to verify all boxes were made up, grds/neut.
Electrical Rough-In10/25/201810/29/201810/29/2018PPASS
DetailsMark Moncarr
Thank you for your time. If you have any questions please give us a call if we are not there and just down the road. If possible anytime after 2 pm. Thank you. Phone #: ###-#### Phone #: ###-#### Inspection requested via web by accounts payable Ok cover. This is a Boise Boys project. Boxes not made up. To keep job timeline on track, another RI inspection will be needed at all locations for makeup requirements before install of any devices.
Electrical Rough-In10/24/201810/26/201810/25/2018PCANC
DetailsMark Moncarr
Thank you for your time. If you have any questions please give us a call if we are not there and just down the road. If possible anytime after 2 pm. Thank you. Phone #: ###-#### >> Inspection requested via web by accounts payable Inspection cancelled from web by: accounts payable