Final | 1/22/2019 | 1/22/2019 | 1/22/2019 | P | PASS |
James Ady
|
|
|
work finished under permit ELE19-00260 final ok
|
Rough-In Permanent Service | 10/15/2018 | 10/16/2018 | 10/16/2018 | P | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Kevin Heideman Rough-in ok to cover p/s u/g n ok
|
Rough-In Permanent Service | 10/14/2018 | 10/15/2018 | 10/15/2018 | A | FAIL |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Kevin Heideman 250.32(A)- Seperate buildings fed by feeders or branch circuits shall have a grounding electrode system installed. 250.68- Connections to grounding electrode system shall be accessible after drywall installed. Mudring. 250.94- Provisions shall be provided for a intersystem bond connected to a grounding electrode system. 300.4- nail plates needed in up east bedroom. 300.15- wiring for disposal shall terminate in a box. wires not in box.
|