Final | 12/27/2018 | 12/28/2018 | 12/28/2018 | A | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Barbara Szurgot Final ok
|
Electrical Rough-In | 11/26/2018 | 11/28/2018 | 11/28/2018 | P | PASS |
Tom Saunders
|
|
|
floor heat Phone #: ###-#### Inspection requested via web by Barbara Szurgot... ok to cover
|
Electrical Rough-In | 11/26/2018 | 11/27/2018 | 11/26/2018 | P | CANC |
Tom Saunders
|
|
|
Inspect floor heat installation Phone #: ###-#### >> Inspection requested via web by Barbara Szurgot Inspection cancelled from web by: Barbara Szurgot
|
Electrical Rough-In | 10/18/2018 | 10/19/2018 | 10/19/2018 | A | PASS |
Eric Story
|
|
|
Access to the new addition from the back yard. Please call Doug with any questions. ###-#### Phone #: ###-#### Inspection requested via web by Barbara Szurgot Rough-in for master bed and bath ok to cover
|