Final | 12/21/2018 | 12/21/2018 | 12/21/2018 | A | PASS |
James Ady
|
|
|
Please contact Greg with RME at ###-#### or the GC Anthony Bryant at ###-####. Final for Cabana. Thank You and have Merry Christmas- Steve Phone #: ###-#### Inspection requested via web by Steve Blackmer Chandelier was not installed at time of final. All other items finished. . Final ok
|
Final | 12/14/2018 | 12/14/2018 | 12/14/2018 | P | FAIL |
James Ady
|
|
|
Final for Cabana. Please call Greg at ###-####. Thank You Phone #: ###-#### Inspection requested via web by Steve Blackmer Wrong contact number Area code is 986. Open canopy on chandelier and handy box in backsplash. areas need finished before final
|
Electrical Rough-In | 10/18/2018 | 10/19/2018 | 10/19/2018 | A | PASS |
James Ady
|
|
|
Gate code #4949. Contact is Greg @###-####. GC onsite is Anthony @###-####. underground cover for trench from pool panel to cabana.
Thank You Phone #: ###-#### Inspection requested via web by Steve Blackmer underground ok to cover. Conduits in columbs ok.
|