Final | 12/14/2018 | 12/14/2018 | 12/14/2018 | P | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton final ok
|
Final | 12/12/2018 | 12/12/2018 | 12/12/2018 | P | NR |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton 330.12- MC cable shall not be installed where exposed to physical damage. Mill work at teller counter has exposed MC under counter knee space. Cabinet contractor scheduled to cover asap. all checked out ok. Will recall when covered.
|
Electrical Rough-In | 12/4/2018 | 12/5/2018 | 12/5/2018 | A | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Ceriling only ok to cover
|
Electrical Rough-In | 10/18/2018 | 10/19/2018 | 10/19/2018 | A | PASS |
James Ady
|
|
|
Marcelo is the contact onsite. Please call ahead 30 minutes if possible. Thank you Phone #: ###-#### Inspection requested via web by Kerri Hamilton front offices, Soffit above tellers and open lobby areas ok to cover.
|