Final | 10/30/2018 | 10/31/2018 | 10/31/2018 | A | PASS |
Tom Saunders
|
|
|
All 220 receptacles hardwired, S.O. corded receptacles placed on 15 amp breakers, panel schedule completed. Phone #: ###-#### Inspection requested via web by Anastacio Fuentes... corrections made..ok to final
|
Final | 10/30/2018 | 10/30/2018 | 10/30/2018 | A | FAIL |
Tom Saunders
|
|
|
Access in to the building is around 9:00 a.m. all receptacles and 220 circuits operable. Dishwasher Disconnect accessible and operable. Receptacles in counter raceway accessible by removal of panel and are cord and plug connected. Phone #: ###-#### Inspection requested via web by Anastacio Fuentes... 1..panel shall be labelled to identify its clear, evident, and specific purpose or use...408.4 2..all single pahase and 3 phase recpticles shall have GFI protection under 50A...210.8(B) 3..verify insta hot breaker size and rating...408.4 4..wall outlets cord connected not on rated circuit..14AWG wire/cord...15Amp circuit..110.3
|
Electrical Rough-In | 10/24/2018 | 10/25/2018 | 10/25/2018 | A | PASS |
Mark Moncarr
|
|
|
West wall and South walls for cover. Phone #: ###-#### Inspection requested via web by Anastacio Fuentes Ok cover S and W half walls.
|
Electrical Rough-In | 10/23/2018 | 10/24/2018 | 10/24/2018 | A | PASS |
Tom Saunders
|
|
|
PVC Conduits in floor for cover. The area is directly in front when you walk in and just need to go through barrier by unzipping the viz-queen. Phone #: ###-#### Inspection requested via web by Anastacio Fuentes... ok to cover underground
|
Electrical Rough-In | 10/19/2018 | 10/22/2018 | 10/22/2018 | P | CANC |
Tom Saunders
|
|
|
Electrical Rough in for floor penetrations and conduit runs for cover. Phone #: ###-#### >> Inspection requested via web by Anastacio Fuentes Inspection cancelled from web by: Anastacio Fuentes
|