Final | 1/10/2019 | 1/10/2019 | 1/10/2019 | P | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Therrin Robertson Final ok
|
Rough-In Permanent Service | 10/25/2018 | 10/25/2018 | 10/25/2018 | A | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Therrin Robertson Rough in ok cover p/s u/g n ok
|
Rough-In Permanent Service | 10/24/2018 | 10/24/2018 | 10/24/2018 | A | FAIL |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Therrin Robertson 225.31- A disconnecting means shall be provided for seperate garage structure on exterior or where conductors enter structure. 300.4- Nail plates shall be installed where NM cable is run thru bored holes that do not maintain 1 1/4" from framing surface. 300.4(B)(1)- NM cables shall be protected from damage where they enter an enclosure. Connectors shall be installed as per manufacturers instructions. Connectors not completely installed at front outdoor receptacle box, both junction boxes for garage wiring at house nad garage, service. 314.25- Recessed can junction box shall be installed to totally cover opening in box. Can at top of stair back cover partially off. 352.46- Where UF cable enters or emerges from PVC conduit it shall be protected from damage by a bushing. 408.7- Unused breaker openings shall be closed.
|