Final | 3/3/2019 | 3/4/2019 | 3/4/2019 | A | PASS |
Mark Moncarr
|
|
|
access code 7285 Phone #: ###-#### Inspection requested via web by Ben Archibald Ok final. Corrections made.
|
Final | 2/26/2019 | 2/27/2019 | 2/27/2019 | A | FAIL |
Rock A. Hudson
|
|
|
*7285 Phone #: ###-#### Inspection requested via web by Ben Archibald 110.3- Furnace field connection if on interior of casing shall be in junction box provide as per manufacturers instructions. Interior wiring shall be 105 degree celcius rated. 314.16- Boses shall have adaquate free conductor space for all conductors and devices installed. Island receptacle boxes 8 cubic inch with 11.25 cubic inches of conductor installed. 356.30- LFNC shall be secured with in 12" of an enclosure. Strap AC whip.
|
Rough-In Permanent Service | 10/30/2018 | 10/31/2018 | 10/31/2018 | A | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Ben Archibald p/s u/g n ok
|