Electrical Rough-In | 11/26/2018 | 11/30/2018 | 11/30/2018 | A | CANC |
Eric Story
|
|
|
Plans have been left on site in the meter box. Phone #: ###-#### Inspection requested via web by Ashley White Needed final
|
Final | 11/30/2018 | 11/30/2018 | 11/30/2018 | P | PASS |
Eric Story
|
|
|
Plans have been left on site in the meter box. Phone #: ###-#### Inspection requested via web by Ashley White Final ok for Solar Array instal
|
Electrical Rough-In | 11/26/2018 | 11/29/2018 | 11/29/2018 | P | PASS |
Eric Story
|
|
|
Please call Brian, the foreman on site, when you are on your way. He can be reached at ###-####. Phone #: ###-#### Inspection requested via web by Ashley White Verified U/L listing of Solar array system and scope of work, OK to proceed
|